All Phases

Phase 02

02Product Development & Engineering

From validated direction to production-ready specifications

Phase Objective

Transform the strategic direction confirmed in Phase 1 into detailed engineering specifications, validated material selections, and a manufacturer-ready technical package.

Key Milestones

  1. 01

    Material Selection & Locking

    Identify, test, and lock raw materials for each product layer based on performance targets established in Phase 1.

  2. 02

    Engineering Specification Package

    Complete technical package including BOM, cross-section diagrams, tolerance ranges, and test protocols — ready for manufacturer quoting.

  3. 03

    DFM Review & Pilot Run

    Design-for-manufacturability review with selected converter, followed by pilot production run to validate specifications under real factory conditions.

Phase Gate

Exit criteria: Approved production-ready spec package, successful pilot run with quality metrics within tolerance, and signed manufacturing agreement.

Phase Summary

Phase Number 02
Typical Duration 8-16 weeks
Key Milestones 3
Our Solutions 1