Engagement Phase
8-16 weeksProduct Development & Engineering
From validated direction to production-ready specifications
Phase Objective
Transform the strategic direction confirmed in Phase 1 into detailed engineering specifications, validated material selections, and a manufacturer-ready technical package.
Key Milestones
-
01
Material Selection & Locking
Identify, test, and lock raw materials for each product layer based on performance targets established in Phase 1.
-
02
Engineering Specification Package
Complete technical package including BOM, cross-section diagrams, tolerance ranges, and test protocols — ready for manufacturer quoting.
-
03
DFM Review & Pilot Run
Design-for-manufacturability review with selected converter, followed by pilot production run to validate specifications under real factory conditions.
Phase Summary
- Phase Number
- 02
- Typical Duration
- 8-16 weeks
- Key Milestones
- 3 milestones
- Our Solutions
- 1 items
Phase Gate
Exit criteria: Approved production-ready spec package, successful pilot run with quality metrics within tolerance, and signed manufacturing agreement.
Exit criteria must be met before proceeding
Ready to Begin?
Schedule a 30-minute discovery call to map your project against our engagement phases.
Book Discovery CallIncluded in This Phase
Related Our Solutions
The following service items are activated during this engagement phase.